Back to search

Department of Environmental and Geographical Science

Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP)

Abstract

dc:description.abstract

Construction of the Mohale Dam (Phase lB) of the Lesotho Highlands Water Project (LHWP) requires a reliable and economic access road for transporting construction materials from the Lesotho-South Africa border. Dam construction is due to begin in 1996. It is at this stage unknown whether the dam wall will be a rockfill or concrete arch; the choice will influence the type and volume of material to be transported. The Lesotho Highlands Development Authority (LHDA) will be responsible for construction and maintenance of the road during dam construction (five years). Thereafter, responsibility for the maintenance of the road reverts to the Roads Department of the Government of Lesotho. The Lesotho Highlands Development Authority (LHDA) awarded Contract 1000 to the Gibbs-Bergman Joint Venture (GBJV) in December 1992. The Environmental . Evaluation Unit (EEU) at the University of Cape Town (UCT) was subsequently contracted by GBJV to conduct an environmental impact assessment of alternative road alignments with the specific brief of investigating biophysical, social and compensation aspects. Impacts associated with dam construction were not included in the terms of reference. The flow diagram in Figure 1 illustrates the role of the various consultants involved in the project, and the phasing of the project components.

Degree

thesis:*
Grantor
Department of Environmental and Geographical Science
Year dc:date.issued
1993

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hughes, Jessica Jane

Subjects

dc:subject × 1

Rights

Language dc:language.rfc3066
eng

Identifiers

dc:identifier.*
Dc Identifier Apacitation
Hughes, J. J. (1993). <i>Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP)</i>. (). ,Faculty of Science ,Department of Environmental and Geographical Science. Retrieved from http://hdl.handle.net/11427/40578
Dc Identifier Chicagocitation
Hughes, Jessica Jane. <i>"Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP)."</i> ., ,Faculty of Science ,Department of Environmental and Geographical Science, 1993. http://hdl.handle.net/11427/40578
Dc Identifier Citation
Hughes, J.J. 1993. Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP). . ,Faculty of Science ,Department of Environmental and Geographical Science. http://hdl.handle.net/11427/40578
Dc Identifier Ris
TY - Thesis / Dissertation AU - Hughes, Jessica Jane AB - [page ii, iv, vi, vii, x, xii, xv, xvii, xix, xxi missing] Construction of the Mohale Dam (Phase lB) of the Lesotho Highlands Water Project (LHWP) requires a reliable and economic access road for transporting construction materials from the Lesotho-South Africa border. Dam construction is due to begin in 1996. It is at this stage unknown whether the dam wall will be a rockfill or concrete arch; the choice will influence the type and volume of material to be transported. The Lesotho Highlands Development Authority (LHDA) will be responsible for construction and maintenance of the road during dam construction (five years). Thereafter, responsibility for the maintenance of the road reverts to the Roads Department of the Government of Lesotho. The Lesotho Highlands Development Authority (LHDA) awarded Contract 1000 to the Gibbs-Bergman Joint Venture (GBJV) in December 1992. The Environmental . Evaluation Unit (EEU) at the University of Cape Town (UCT) was subsequently contracted by GBJV to conduct an environmental impact assessment of alternative road alignments with the specific brief of investigating biophysical, social and compensation aspects. Impacts associated with dam construction were not included in the terms of reference. The flow diagram in Figure 1 illustrates the role of the various consultants involved in the project, and the phasing of the project components. DA - 1993 DB - OpenUCT DP - University of Cape Town KW - Environmental and Geographical Science LK - https://open.uct.ac.za PY - 1993 T1 - ETD: Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP) TI - ETD: Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP) UR - http://hdl.handle.net/11427/40578 ER -
Dc Identifier Vancouvercitation
Hughes JJ. Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP). []. ,Faculty of Science ,Department of Environmental and Geographical Science, 1993 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/40578

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
citation

Hughes, Jessica Jane. Environmental evaluation of two alternative road alignments to the Mohale dam (phase 1B of LHWP). Department of Environmental and Geographical Science, 1993. https://hdl.handle.net/11427/40578