Back to search

Department of Mechanical Engineering

Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station

Abstract

dc:description.abstract

Includes bibliographical references (leaves 79-83).

Degree

thesis:*
Grantor dc:publisher.institution
Department of Mechanical Engineering
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Kabia, John Amara

Subjects

dc:subject × 1

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Dc Identifier Apacitation
Kabia, J. A. (2005). <i>Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station</i>. (Thesis). University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering. Retrieved from http://hdl.handle.net/11427/5526
Dc Identifier Chicagocitation
Kabia, John Amara. <i>"Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station."</i> Thesis., University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering, 2005. http://hdl.handle.net/11427/5526
Dc Identifier Citation
Kabia, J. 2005. Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station. University of Cape Town.
Dc Identifier Ris
TY - Thesis / Dissertation AU - Kabia, John Amara AB - Includes bibliographical references (leaves 79-83). DA - 2005 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 2005 T1 - Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station TI - Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station UR - http://hdl.handle.net/11427/5526 ER -
Dc Identifier Vancouvercitation
Kabia JA. Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station. [Thesis]. University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering, 2005 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/5526

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Kabia, John Amara. Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station. Department of Mechanical Engineering, 2005. https://hdl.handle.net/11427/5526