Back to search
Clemson University
Single and Multiple Objective Scheduling Methods for Railyards with Earliness and Tardiness Concerns
Degree
thesis:*- Name thesis:degree_name
- Doctor of Philosophy (PhD)
- Level thesis:degree_level
- Dissertation
- Discipline thesis:degree_discipline
- Industrial Engineering
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Randall, Robert G.
- Contributors dc:contributor
-
- Mary E. Kurz
Identifiers
dc:identifier.*- Repository record dc:identifier
- https://open.clemson.edu/arv_dissertations/1107