Goce Delcev University, Stip
Optimizing of the recovery of ore reserves for underground mining of metal ore deposits
Abstract
dc:description.abstractIn PhD thesis is elaborated optimizing level of ore reserves exploitation and depletion in underground mining of metal ore deposits. Specific practical example of the “Svinja Reka” ore deposit are detail elaborated on the interval between horizons XIVb and 830 in "Sasa" mine and thus are certain optimum values оf the utilization coefficient (coefficient of losses) and the ore depletion. Optimization is performed using the net present value. Important parameters for a given ore deposit, technological and economic parameters are detail elaborated. Total costs and revenues that are realized during deposit exploitation are detail elaborated and based on which the optimization on the utilization coefficient and the depletion of the ore is performed. Keywords: underground mining, ore reserves, sublevel caving, optimization, recovery, dilution, losses, costs, revenue, net present value, internal rate of return.
Degree
thesis:*- Name dc:type.qualificationname
- phd
- Level dc:type.qualificationlevel
- doctoral
- Grantor dc:publisher.institution
- Goce Delcev University, Stip
- Year dc:date.issued
- 2015
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Mijalkovski, Stojance
Subjects
dc:subject × 1Rights
- Language dc:language
- en
Identifiers
dc:identifier.*- Repository record dc:identifier.uri
- https://eprints.ugd.edu.mk/13720/