Short Term Unit Commitment as a Planning Problem

Abstract

dc:description.abstract

‘Unit Commitment’, setting online schedules for generating units in a power system to ensure supply meets demand, is integral to the secure, efficient, and economic daily operation of a power system. Conflicting desires for security of supply at minimum cost complicate this. Sustained research has produced methodologies within a guaranteed bound of optimality, given sufficient computing time. Regulatory requirements to reduce emissions in modern power systems have necessitated increased renewable generation, whose output cannot be directly controlled, increasing complex uncertainties. Traditional methods are thus less efficient, generating more costly schedules or requiring impractical increases in solution time. Meta-Heuristic approaches are studied to identify why this large body of work has had little industrial impact despite continued academic interest over many years. A discussion of lessons learned is given, and should be of interest to researchers presenting new Unit Commitment approaches, such as a Planning implementation. Automated Planning is a sub-field of Artificial Intelligence, where a timestamped sequence of predefined actions manipulating a system towards a goal configuration is sought. This differs from previous Unit Commitment formulations found in the literature. There are fewer times when a unit’s online status switches, representing a Planning action, than free variables in a traditional formulation. Efficient reasoning about these actions could reduce solution time, enabling Planning to tackle Unit Commitment problems with high levels of renewable generation. Existing Planning formulations for Unit Commitment have not been found. A successful formulation enumerating open challenges would constitute a good benchmark problem for the field. Thus, two models are presented. The first demonstrates the approach’s strength in temporal reasoning over numeric optimisation. The second balances this but current algorithms cannot handle it. Extensions to an existing algorithm are proposed alongside a discussion of immediate challenges and possible solutions. This is intended to form a base from which a successful methodology can be developed.

Degree

thesis:*
Name dc:type.qualificationname
Masters
Level dc:type.qualificationlevel
masters
Grantor dc:publisher.institution
Durham University
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Campion, Joshua Robert

Rights

Language dc:language.dcterms_iso639_2
eng

Identifiers

dc:identifier.*
Repository record dc:identifier.uri
https://etheses.durham.ac.uk/id/eprint/10650/

Chain of custody

source
Harvested from
Durham University
Base URL
etheses.dur.ac.uk/cgi/oai2
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
related terms
citation

Campion, Joshua Robert. Short Term Unit Commitment as a Planning Problem. masters thesis, Durham University, 2014. https://etheses.durham.ac.uk/id/eprint/10650/