Back to search

Durham University

Microprocessor-based on-load valve sequencing for a turbo-alternator

Abstract

dc:description.abstract

An analog on-load valve sequencing system that is used to test the performances of the valves on a turbo-alternator can be replaced by a microcomputer testing system. On the way to the full-scale computerising of turbo-generator control systems, this type of testing system may be used under the control of a full-size supervisory computer. This microprocessor-based testing system provides test sequencing of the valves of an Electro-Hydraulic Governor. The hardware for the interfacing and scaling, and the firmware for the microprocessor are developed for one valve. The extension of the technique to the task of testing multiple valves in sequence is also discussed.

Degree

thesis:*
Name dc:type.qualificationname
Masters
Level dc:type.qualificationlevel
masters
Grantor dc:publisher.institution
Durham University
Year dc:date.issued
1979

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ozgur, M. R.

Rights

Language dc:language.dcterms_iso639_2
eng

Identifiers

dc:identifier.*
Dc Identifier Grantnumber
UkUDh:CyT

Chain of custody

source
Harvested from
Durham University
Base URL
etheses.dur.ac.uk/cgi/oai2
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
related terms
citation

Ozgur, M. R.. Microprocessor-based on-load valve sequencing for a turbo-alternator. masters thesis, Durham University, 1979. https://etheses.durham.ac.uk/id/eprint/9131/