Abstract
dc:description.abstractEnergy retrofits can be executed by a building owner with or without the supervision of a third-party agent. We define process models to capture third-party energy retrofit inspection activities, and refine, augment, and generalize those models to then examine the impact of third-party retrofit inspections. Buildings included in the study vary considerably in type, and so do retrofit programs applied to those buildings.
Degree
thesis:*- Level thesis:degree_level
- Masters
- Department dc:contributor.department
- Architecture
- Grantor dc:publisher
- Georgia Institute of Technology
- Year dc:date.issued
- 2015
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Szymkiewicz, Paul M.
- Advisor dc:contributor.advisor
-
- Augenbroe, Godfried
- Committee member dc:contributor.committeemember
-
- Brown, Jason
Subjects
dc:subject × 2Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1853/53891