Back to search

Georgia Institute of Technology

Successful delivery of flash track projects

Abstract

dc:description.abstract

This research explores a higher order of fast tracking, called Flash Tracking, in response to increasing calls for faster, more reliable project deliveries. Flash Tracking is defined as a time-driven project, which by necessity requires a heightened degree of concurrency between engineering, procurement, and construction. In contrast to fast tracking, which entails a level of concurrency between engineering, procurement, and construction that has become a staple of the construction industry, Flash Tracking extends the envelope by requiring a series of innovative practices across the project delivery spectrum. The specific research questions pursued include: 1) identifying which innovative improvements in project delivery methodology could be made to compress project durations, while maintaining safety, quality, and risk tolerance, and 2) addressing how project teams can best overcome barriers to delivering shorter project durations. A multi-method research project was undertaken to address these questions, which entailed an extensive review of the literature, structured case study interviews, and multiple group decision-making exercises. The literature review focused on the construction industry, as well as manufacturing, shipbuilding, and software development, to identify practices and techniques potentially relevant to Flash Tracking that could be extended to the construction industry. Group decision-making exercises included a modified Delphi method study, an Analytic Hierarchy Process, and a series of research charrettes or focus groups. These studies produced a prioritized, two-tiered listing of 47 essential Flash Track practices, providing practitioners with both a measure to assess their readiness for undertaking a Flash Track project and strategies for increasing their readiness. A subsequent study--a semantic network analysis--refined and buttressed the research team’s earlier findings. This two-year study, conducted in concert with industry experts, led to a re-engineered engineering, procurement, and construction (EPC) model which embraces relational contract strategies, improved communications, and the early engagement of key stakeholders.

Degree

thesis:*
Level thesis:degree_level
Doctoral
Department dc:contributor.department
Building Construction
Grantor dc:publisher
Georgia Institute of Technology
Year dc:date.issued
2016

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Austin, Robert Brendon
Advisors dc:contributor.advisor
  • Pishdad-Bozorgi, Pardis
  • Roper, Kathy O.
Committee members dc:contributor.committeemember
  • de la Garza, Jesus M.
  • Ashuri, Baabak
  • Emiliani, Robert

Subjects

dc:subject × 2

Rights

Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1853/54990

Chain of custody

source
Harvested from
Georgia Tech
Base URL
repository.gatech.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Austin, Robert Brendon. Successful delivery of flash track projects. Doctoral thesis, Georgia Institute of Technology, 2016. http://hdl.handle.net/1853/54990