University of Patras
Εφαρμογή πολυ-πρακτορικού συστήματος με σημασιολογική οντολογία για κάθετη ολοκλήρωση περιβάλλοντος παραγωγής με έμφαση στο επίπεδο ελέγχου παραγωγής
Abstract
dc:descriptionThe present dissertation focuses and presents an integrated solution to the problem of vertical business integration that is the transparent integration of applications and systems that is possible to operate in different levels within the classical hierarchy of the industrial/production environment. This hierarchy comprises of the ERP field control and the device layer. The industrial environment is characterized by particular complexity and is highly heterogeneous. As a result any attempt to modify the existing production processes is particularly difficult. This project combines standards established and emerging technologies to address two contradicting requirements integration and flexibility.
Degree
thesis:*- Grantor dc:publisher
- University of Patras
- Year dc:date
- 2009
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Γεωργουδάκης, Εμμανουήλ
- Georgoudakis, Manos
Subjects
dc:subject × 17- Οντολογία
- Βιομηχανική ολοκλήρωση
- Πολύ-πρακτορικό σύστημα
- Προσομοίωση βιομηχανικών διεργασιών
- Κατανεμημένα συστήματα ελέγχου
- Πρότυπα ολοκλήρωσης
- Ontology
- Semantics
- Integration standards
- Productio process simulation
- Industrial integration
- Multi - agent systems
- Distributed control
- Επιστήμες Μηχανικού και Τεχνολογία
- Επιστήμη Ηλεκτρολόγου Μηχανικού, Ηλεκτρονικού Μηχανικού, Μηχανικού Η/Υ
- Engineering and Technology
- Electrical Engineering, Electronic Engineering, Information Engineering
Rights
- Language dc:language
- gre
Identifiers
dc:identifier.*- Identifier
- 10.12681/eadd/26438