Democritus University of Thrace (DUTH)
Βελτιστοποίηση παραμέτρων σχεδιασμού τεχνητών υγροβιότοπων κατακόρυφης ροής για την επεξεργασία αστικών υγρών αποβλήτων και λάσπης με χ...
Abstract
dc:descriptionThe purpose of the present doctoral dissertation was to study the effect of various constructional and operational parameters on the performance of Vertical Flow Constructed Wetlands (VFCW) systems for wastewater treatment and sludge dewatering, aiming at the the optimization of system efficiency. Ten pilot-scale, cylindrical, Vertical Flow Constructed Wetlands (area 0.57 m²) were constructed and operated continuously for three years in parallel experiments, treating synthetic municipal wastewater, simulating the first treatment stage of full-scale systems. The wetland units were planted with two plant species (i.e., common reeds and cattails), had different porous media material composition and origin (i.e., carbonate, igneous, zeolite and bauxite) and three different total substrate thicknesses and gradations. Three loading/resting schedules were used: 2 days of feeding, followed by 4, 6 and 8 days of resting. Water quality samples were collected at the inlet and the outlet of each unit, and were analyzed in the laboratory for BOD5, COD, TKN, ammonia nitrogen, nitrate, nitrite, TP and ortho-phosphate. The VFCW units were quite efficient in organic matter and nitrogen removal, with mean removal rates exceeding 78% and 58%, respectively. Mean phosphorus retention was lower (37%). The units managed to treat effectively even extremely high organic loads, up to 200 g COD/m²/d. The presence of reeds and aeration tubes was found to improve the performance, while plant species did not affect the efficiency. The use of porous media (zeolite and bauxite) with special properties, such as the cation exchange ability and adsorption of specific constituents, did not improve the wetland efficiency, probably due to limited contact time between the material and wastewater, and is not recommended. The most effective substrate thickness was that of 80 cm, which included an extended (30 cm) sand layer. Stepwise multiple linear regression was used to produce equations, which could help in effluent quality prediction and in the initial system design. Model results showed very good correlation (R² > 0.90) with the inlet surface BOD5 load, hydraulic loading rate and wastewater temperature. Additionally, various gravity filters containing zeolite, bauxite and carbonate material were constructed and operated for three years, to provide additional treatment of the effluent of a pilot-scale Vertical Flow Constructed Wetland (VFCW). Results showed a significant improvement of the VFCW effluent quality. The overall treatment performance of the system VFCW + gravity filter reached 90-98% removal of organic matter, 60-95% removal of nitrogen, and 40-71% retention of phosphorus. Zeolite was more effective in nitrogen and organic matter removal, while bauxite in phosphorus retention. The carbonate material had the lowest efficiency among all filter units, while the filter containing a 50-50% mixture of zeolite and bauxite showed the highest efficiency in pollutant removals. The increase of the residence time from one to two days did not show a respective significant increase in removal rates. Gradual phosphorous saturation of all filter materials takes place faster compared to the other pollutants. Based on the mean annual removal rate during the first operation years, it is estimated that the useful lifetime until full saturation with phosphorus varies between 8-9 years. Furthermore, eleven pilot-scale Sludge Drying Reed Beds (SDRBs) units have been constructed and operated under various design and operational characteristics. The beds included a cobbles bottom layer, where perforated PVC aeration tubes were placed. Two gravel (medium and fine) layers were placed above the cobbles layer. The setup included planted beds with common reeds and control units. Three sludge loading rates (SLR) were examined: 30, 60 and 75 kg dm/m²/yr. The dewatering efficiency of the planted units exceeded 95% volume reduction. The final dry matter content varied between 50-64%, depending on the applied SLR. Mineralization of the residual sludge also took place. Evapotranspiration is the major dewatering process that takes place in the systems, accounting for 58% to 84% of total water losses, depending on unit characteristics, sludge loading, season and other parameters. Draining follows in significance, with respective values varying from 13% to 41% of total water losses, while 1% to 4% of water remains in the sludge layer. VS content of the planted units decreased up to 25%, while nutrient concentration was also reduced. The presence of reeds, aeration tubes and a fine-grained material improved the system efficiency, while the material composition did not have any effect on efficiency. Heavy metal (HM) accumulation in the residual sludge layer was low, and was found to increase with sludge layer depth. Less than 16% of the influent HM left the bed through drainage. HM accumulation in the gravel layer was the major metal sink in the mass balance. Moreover, the units were able to treat sludge with high concentration of Cr. Plant uptake of nutrients and heavy metals was low and, mainly, located in the below-ground biomass. The final sludge product proved to be well stabilized, since both indices C-CO2 and SRI12 were below the respective limits (3 g / dry kg and 100 mg / dry kg / h) at the end of the final resting phase. The germination index was above 100% in all planted units, indicating a mature material too. On the whole, the final sludge product satisfies the limits for heavy metal content, total coliforms, stability and maturity, which makes it appropriate for further exploitation, e.g., for application on rural land.
Degree
thesis:*- Grantor dc:publisher
- Democritus University of Thrace (DUTH)
- Year dc:date
- 2011
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Stefanakis, Alexandros
- Στεφανάκης, Αλέξανδρος
Subjects
dc:subject × 17- Τεχνητοί υγροβιότοποι
- Κατακόρυφη ροή
- Επεξεργασία υγρών αποβλήτων
- Αφυδάτωση και ξύρανση λυματολάσπης
- Βιολογική ίλυς
- Πιλοτικές μονάδες
- Κλίνες καλαμιών
- Constructed wetlands
- Vertical flow
- Wastewater treatment
- Wastewater sludge dewatering and drying
- Pilot-scale units
- Reed beds
- Engineering and Technology
- Environmental Engineering
- Επιστήμες Μηχανικού και Τεχνολογία
- Περιβαλλοντική Μηχανική
Rights
- Language dc:language
- gre
Identifiers
dc:identifier.*- Identifier
- 10.12681/eadd/27086