Ανάπτυξη ολοκληρωμένου συστήματος προκοστολόγησης οδικών γεφυρών από σκυρόδεμα

Abstract

dc:description

The present hindrance of transport projects’ financing from public and private sources renders necessary the thorough cost / benefit analysis of every planned project. Bridge construction absorbs significant percentage share of the total investment in road infrastructure. At the same time, it presents important budget overruns. Consequently, it is important to achieve reliable cost estimates during the preliminary project stages, when only the basic specifications and the initial technical solutions are known. Very few research studies concerning cost estimation of road bridges have been published till today. These studies rely mostly on theoretical resolutions of mathematic algorithms based on bridge design codes and not on actual data from constructed projects. Furthermore, they do not cover all bridges’ parts (foundation, piers, abutments, deck). At the same time, there is lack of available databases with actual construction and cost data from bridge projects. The present thesis covers the need for scientific research in the development of a complete cost estimate system for concrete road bridges that relies on a database with actual construction and cost data. Actual cost data from 111 constructed road bridges of the Egnatia Motorway in Northern Greece have been collected. The statistical processing led to estimates of the average construction cost per deck surface unit area for three bridge construction methods (precast beams placed by launching beam or crane, cast-in-situ and balanced cantilever). The research led to the conclusion that in order to achieve high accuracy in cost estimates, it is necessary to estimate the cost of the three basic components of the bridge (foundation, piers, deck) with independent statistical models. As a first step, an extensive database was established, in which detailed material quantities and cost data were recorded. A special application was developed with separate procedures to record data, conduct queries and present the results in reports. Special emphasis was given on the bridges of the Egnatia Motorway, from which the data sample was drawn. The adopted design codes, as well as the design and construction management procedures, are thoroughly described. The linear regression method was selected for the statistical processing of the collected data. The respective chapter of the thesis includes a brief review of the method’s general principles and assumptions, as well as the special issues that should be examined in order to verify its correct application. Variations of the linear regression method used for the selection of the best equation, as well as the necessity for the application of the bootstrap method in the regression were also examined. In order to estimate the piers’ foundation cost, a model with three distinct stages was developed: selection of foundation system, calculation of quantities of work and calculation of construction cost. A ground classification system, as well as an expert system are proposed, which allow the selection of the suitable type of foundation. The application of the backward stepwise regression methodology led to the development of prediction models for the quantities of concrete and reinforcing steel for the main foundation types. The regression’s major assumptions and statistical results were examined in order to confirm the validity and the satisfactory adaptation of the proposed models. Parametric ranges of the regression coefficients were proposed with the use of the bootstrap method. In order to estimate the cost of the bridge’s piers and superstructure, prediction models for the quantities of works for the three widely used construction methods mentioned above were developed with the use of regression analysis. The regression’s major assumptions and statistical results were examined, while a 10-fold validation method was applied in order to evaluate the prediction performance of the superstructure’s proposed models. Finally, a resampling method that provides parametric ranges of the superstructure cost was developed. The complete concrete road bridges’ cost estimate system was implemented with the use of "Java" programming language. The processes of data entry and production of the results of quantities of work, construction cost and parametric ranges were presented for two case examples of road bridges. The systems’ application allows the rapid comparison of alternative bridge design forms, in order to select the optimal solution from a technical and economical standpoint.

Degree

thesis:*
Grantor dc:publisher
National Technical University of Athens (NTUA)
Year dc:date
2012

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Fragkakis, Nikolaos
  • Φραγκάκης, Νικόλαος

Subjects

dc:subject × 12

Rights

Language dc:language
gre

Identifiers

dc:identifier.*
Identifier
10.12681/eadd/27531

Chain of custody

source
Harvested from
Greek National Archive of PhD Theses
Base URL
phdtheses.ekt.gr/eadd_oai/request
Last updated
2026-11-18
Source record
OAI-PMH GetRecord
citation

Fragkakis, Nikolaos; Φραγκάκης, Νικόλαος. Ανάπτυξη ολοκληρωμένου συστήματος προκοστολόγησης οδικών γεφυρών από σκυρόδεμα. National Technical University of Athens (NTUA), 2012. http://hdl.handle.net/10442/hedi/27531