Back to search

Aristotle University Of Thessaloniki (AUTH)

Αξιολόγηση μέσων και μεθόδων κατάρτισης δασικού κτηματολογίου

Abstract

dc:description

Τhe aim of the thesis is to evaluate the means and methods of Forest cadastre’s implementation of the most simple to the most advanced with the assistance of PC as required by the modern socio-economic and natural conditions of the Greek reality. The suggested methods are: - Classical Topographical method or direct surveying. - Photogrammetrical method or indirect surveying. In the present thesis we are going to deal with the analytical and the digital photogrammetrical surveying method. During the surveying of the research areas, several phases of the work were timed by a JUNG HANS stopwatch. As regards the implementation of the Topographical method we reached the following conclusions: - The time needed to perform of the areas’ surveying is a significant drawback. - As we saw above, the rural-forest performance is higher than the forest area one because we can cover larger area with only one instrument stop. - The factor that affects predominantly the time of surveying is the form of coverage of the surface of the earth. After that follows the topography of the area, the slope distance and to a lesser extent the size of the slope. The effect of these factors on the performance of the cadastral survey map of a region with the topographical method is particularly obvious. - In terms of errors in the implementation of surveying works the mixed region presents significantly lower errors and therefore higher precision than the pure forest. As regards the implementation of the analytical method we concluded to the following: - While in the Topographical method the primary data are the angles and the distances in the field, the analytical photogrammetrical method is processing the coordinates at the photographical level, i.e. we perform measurements from a distance. - It collaborates with a PC and so it can process a big information data. - With the creation of the digital terrain model we can have a database for further use and processing. - For the implementation of the method specialized staff is needed, not only for the handling of the analytical instrument, but also with advanced knowledge of Photogrammetry. This is not necessary for the classical method. We concluded to the following regarding to the digital method implementation: - Automation of all operations and wide availability of storage and data processing. - The connection with other databases and storage of any other information beyond the coordinates is possible. - The best in accuracy and quality cadastral map is created. Similarly, the DTM created by the digital method is more accurate and is produced within a shorter period in relation to the DTM resulting from the analytical method. Also is created sooner than the DTM the resulting from classical (Topographical) method.

Degree

thesis:*
Grantor dc:publisher
Aristotle University Of Thessaloniki (AUTH)
Year dc:date
2000

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Drosos, Vasileios
  • Δρόσος, Βασίλειος

Subjects

dc:subject × 24

Rights

Language dc:language
gre

Identifiers

dc:identifier.*
Identifier
10.12681/eadd/27581

Chain of custody

source
Harvested from
Greek National Archive of PhD Theses
Base URL
phdtheses.ekt.gr/eadd_oai/request
Last updated
2026-11-18
Source record
OAI-PMH GetRecord
citation

Drosos, Vasileios; Δρόσος, Βασίλειος. Αξιολόγηση μέσων και μεθόδων κατάρτισης δασικού κτηματολογίου. Aristotle University Of Thessaloniki (AUTH), 2000. http://hdl.handle.net/10442/hedi/27581