Technical University of Crete (TUC)
Risk analysis of ground water contamination detection networks, using stochastic modeling and decision theory
Abstract
dc:descriptionThe main objective of the thesis is to study the detection probability achieved by a linear arrangement of monitoring wells and to evaluate the risk of groundwater pollution, which is created in a very short time and comes from a point source within a control area. The study was conducted by creating a two-dimensional stochastic model based on the Monte Carlo framework, simulating transport and dispersion of groundwater pollution. The risk assessment is done within the decision framework on the restoration of the environmental damage. In addition risk evaluation, in terms of probability, in the performance of a monitoring wells system was conducted in relation to the delay in controlling pollution’s expansion. This research investigates the effect of the hydrogeological environment, the precipitation, the frequency of sampling and the delayed response in controlling subsurface pollution after a successful detection has been achieved, in the performance of a linear system of groundwater pollution monitoring wells.The main objectives of the thesis were:• The evaluation of the effect of the hydrogeological characteristics of the field (heterogeneity, dispersion coefficients), the size of the control area and the number of pollution sources in the successful detection probability of underground pollution from a linear array of monitoring wells. It was shown that the main factor affecting the detection of pollution was the field’s dispersion.• The evaluation of the effect of sampling frequency on the probability of successful detection of groundwater pollution. Sampling must take place at least twice a year, depending on the field’s dispersion.• The determination of the probability of groundwater pollution detection from a linear arrangement of monitoring wells, which originates from repeated incidents of pollution that are associated with precipitation and runoff in a period of 30 years.• The evaluation of the delay response in the remediation of groundwater pollution in relation to the performance of monitoring wells network, where it was shown that delay in controlling pollution after successful detection is equivalent to performance degradation of the monitoring facility.• The study of the effect of the above factors in the decision making process for monitoring and remediation of underground pollution from a surveillance area (landfills, underground storage tank, underground pipelines).
Degree
thesis:*- Grantor dc:publisher
- Technical University of Crete (TUC)
- Year dc:date
- 2013
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Papapetridis, Konstantinos
- Παπαπετρίδης, Κωνσταντίνος
Subjects
dc:subject × 24- Ρύπανση υπόγειων υδάτων
- Τεχνική Μόντε Κάρλο
- Πηγάδια παρακολούθησης υπόγειας ρύπανσης
- Στοχαστικό μοντέλο
- Ετερογένεια γεωλογικού πεδίου
- Διασπορά ρύπανσης
- Πιθανότητα ανίχνευσης
- Καθυστέρηση αντίδρασης αποκατάστασης ρύπανσης
- Groundwater pollution
- Monte carlo
- Groundwater pollution monitoring wells
- Stochastic modelling
- Geologic filed heterogeneity
- Pollution dispersion
- Detection probability
- Remediation action delay time
- Φυσικές Επιστήμες
- Γεωεπιστήμες και Επιστήμες Περιβάλλοντος
- Επιστήμες Μηχανικού και Τεχνολογία
- Περιβαλλοντική Μηχανική
- Natural Sciences
- Earth and Related Environmental Sciences
- Engineering and Technology
- Environmental Engineering
Rights
dc:rights- Statement dc:rights
-
- BY_NC
- Language dc:language
- eng
Identifiers
dc:identifier.*- Identifier
- 10.12681/eadd/35392