Aristotle University Of Thessaloniki (AUTH)
Εφαρμογή θεωρίας περιορισμών στον προγραμματισμό και έλεγχο παραγωγής: ανάλυση με τεχνικές θεωρίας δυναμικής συστημάτων
Abstract
dc:descriptionThis research is on the short-term Production Planning and Control (PPC) for make-to-order / flow-shop manufacturing systems. In particular, it proposes a novel dynamic PPC system (DBR-PPC system), which integrates the Drum-Buffer-Rope (DBR) approach of Theory of Constraints (TOC) into a System Dynamics (SD) model. In the first step of the thesis, a thorough literature review revealed that the incorporated time buffer in DBR-PPC systems is considered as an exogenous constant parameter defined by production managers. However, this empirical approach ignores the continuously changing external and internal environment of manufacturing. In the second step of the thesis, the proposed DBR-PPC model is developed by means of SD methodology. The innovative element of this model is on developing an endogenous dynamic control mechanism for continuously tuning the time buffer (Production Time Buffer - PTB). This control mechanism, practically, monitors the dynamic demand changes and the operational disturbances of the manufacturing system itself (existence of limited material, capacity constraint resource (CCR) shutdown due to worker absence or machine breakdown). This model reflects the operation of a typical make-to-order / flow-shop manufacturing system with a CCR. The typical system produces a single product and purchases one type of raw material. The main operational assumptions include normal distribution for demand and stochastic processing times. The proposed model is a non-linear, dynamic, mathematical model of twelfth degree and it is developed by means of the simulation software Powersim® 2.5c. Its effectiveness is evaluated by ten indices. In the third step of the thesis, the behavior of the DBR-PPC system is simulated under various sets of value of its seven control parameters (five control parameters of the external and internal environment and two control parameters of the PTB value). The PTB control parameters are the parameter K1 calculating the PTB increase and the parameter K2 calculating the PTB decrease. The effect of various PTB planning policies (parameters K1 and K2) on the effectiveness of the manufacturing system is examined by extensive numerical investigation under various levels of the rest control parameters. For this purpose, a thorough sensitivity analysis was conducted based on three groups of simulation runs and Analysis of Variance (ANOVA) of the simulation results was conducted in each group. The results of the sensitivity analysis revealed that, there is no meaning to track a specific combination of K1 and K2 - inside their definition limits - in order to optimize the manufacturing process indices. The PTB control mechanism is revealed to be robust to changes of external environment (demand) and internal environment (operational disturbances of the manufacturing system itself). In the fourth step of the thesis, the effectiveness of the proposed DBR-PPC system was compared to that which assumes different operational assumptions.
Degree
thesis:*- Grantor dc:publisher
- Aristotle University Of Thessaloniki (AUTH)
- Year dc:date
- 2015
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Politou, Alexandra
- Πολίτου, Αλεξάνδρα
Subjects
dc:subject × 16- Προγγραμματισμός και Έλεγχος Παραγωγής
- Θεωρία Περιορισμών (Εφαρμογή DBR)
- Δυναμική συστημάτων
- Παραγωγή συνεχούς ροής
- Προσομοίωση
- Χρονικό Απόθεμα
- Production planning and control
- Theory of Constraints (DBR)
- System dynamics
- Flow-shop
- Simulation
- Time buffer
- Επιστήμες Μηχανικού και Τεχνολογία
- Επιστήμη Μηχανολόγου Μηχανικού
- Engineering and Technology
- Mechanical Engineering
Rights
- Language dc:language
- gre
Identifiers
dc:identifier.*- Identifier
- 10.12681/eadd/36175