Ανάπτυξη δυναμικού προτύπου υλοποίησης τεχνικών έργων με τη μέθοδο σύμπραξης δημοσίου και ιδιωτικού τομέα (ΣΔΙΤ)

Abstract

dc:description

The aim of the PhD thesis was the study of the dynamic behaviour of Public-Private Partnerships (PPPs) at a national level. The methodological approach used for this scope is System Dynamics (SD). Initially, an extensive literature review took place to capture the issues associated with PPPs and their performance. The review revealed that market demand or usage volume is a critical parameter of economic viability either in user-pay PPPs or in authority-pay PPPs. Moreover, the literature review showed that most studies relevant in risk management of PPPs, describe causal influences either at a generic level or using a specific approach that case-oriented studies provide. Then we developed two SD models based on the functional separation of PPPs: PPP projects with authority payments (Authority-Pay SD Model) and PPPs with user payments (User- Pay SD Model). Each SD model was analysed to assess financially and socially sustainable management strategies of the national public-private partnership (PPP) programmes. Sustainability is defined as the long-term ability of the actors involved -i.e., public and private sectors and society- to sustain operating PPPs and benefit from them. Causal-loop diagrams revealed the interrelationships among system components and demonstrate that the management of national PPP programmes constitutes a complex dynamic system. The causal-loop diagrams were next transformed into stock-and-flow diagrams to simulate the influence of interrelationships and feedback loops among physical, financial, and social sectors. The SD models were developed using the simulation programming language of Powersim 2.5c. Each SD model was tested for its validity according to the principles of the SD theory. The SD models passed all tests successfully. Extensive simulation experimentation with each SD model took place to estimate the impact of changes in exogenous variables (parameters) on the sustainable development of PPP programmes. A total of twenty parameters were selected to test the statistical significance of each on the system’s sustainability for example, the available labour force, income tax, and cost of private capital for PPPs, construction cost overrun, and time delay in construction. The parameters were categorised into the following thematic groups: socio-economic environment, project characteristics, financial environment, government policies and risks. Analysis of Variance revealed the statistical significance of each parameter on the system’s sustainable terms. A comparative assessment of the effects between the two SD models was then discussed. Ιn the final stage of the dissertation, both SD models are proposed as methodological tools designed to contribute to strategic decision making by governments aiming to implement PPP programmes.

Degree

thesis:*
Grantor dc:publisher
Aristotle University Of Thessaloniki (AUTH)
Year dc:date
2019

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Pagoni, Eirini-Grammati
  • Παγώνη, Ειρήνη-Γραμματική

Subjects

dc:subject × 16

Rights

dc:rights
Statement dc:rights
  • BY_NC_SA
Language dc:language
gre

Identifiers

dc:identifier.*
Identifier
10.12681/eadd/45469

Chain of custody

source
Harvested from
Greek National Archive of PhD Theses
Base URL
phdtheses.ekt.gr/eadd_oai/request
Last updated
2026-11-18
Source record
OAI-PMH GetRecord
citation

Pagoni, Eirini-Grammati; Παγώνη, Ειρήνη-Γραμματική. Ανάπτυξη δυναμικού προτύπου υλοποίησης τεχνικών έργων με τη μέθοδο σύμπραξης δημοσίου και ιδιωτικού τομέα (ΣΔΙΤ). Aristotle University Of Thessaloniki (AUTH), 2019. http://hdl.handle.net/10442/hedi/45469