Σχεδιασμός άμεσης υποστήριξης σε θέσεις συμβολής σηράγγων

Abstract

dc:description

This thesis deals with tunnels primary support design issues, emphasizing on tunnel junction areas. The problem is approached through three-dimensional numerical simulation with parametric investigation of in-situ stress and rockmass mechanical properties. The evaluation of the results focuses on support stress resultants and displacements since these are a key tunnel design criterion. Numerical simulations in strong rock masses incorporate an advanced strain – softening constitutive model while in cases of anisotropic rock masses a ubiquitous joints model is introduced. All continuous media numerical analyzes were performed using FLAC3D finite difference code, while for non-continuous media analyzes the 3DEC and RS2 codes were used. The simulation process included axisymmetric, three-dimensional and plane strain analyzes. In all numerical simulations, sequential excavation and support was applied in all stages (top heading, bench – invert) for both main and escape tunnel. According to the findings of the present thesis, after the construction of the escape tunnel the support of the main tunnel is unloaded in the junction area with the crown of the escape tunnel and is overloaded in the junction area with the side wall of the escape tunnel. In the unloading area, the unloading is severe and the development of tensile axial forces after the construction of the escape tunnel is possible. In that area, it is proposed to reinforce the main tunnel lining with the use of steel mesh and/or lattice girders or even a regular reinforcement to avoid tensional cracks in the shotcrete. In contrast, in the overload area the development of axial compressive forces is very intense. In this area it is proposed to increase the thickness of the sprayed concrete or to predict the construction of an elephant foot to avoid the failure of the sprayed concrete in compression. In general, there is no increase in the stress resultants of the escape tunnel in close proximity to the main tunnel. Finally, given the complex geometry of the excavation in the junction area, structurally controlled failure may occur. Hence, additional rock bolts, steel mesh and spilling may be required for failure control and according to rock mass jointing.

Degree

thesis:*
Grantor dc:publisher
National Technical University of Athens (NTUA)
Year dc:date
2022

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Gkikas, Vasileios
  • Γκίκας, Βασίλειος

Subjects

dc:subject × 23

Rights

Language dc:language
gre

Identifiers

dc:identifier.*
Identifier
10.12681/eadd/53825

Chain of custody

source
Harvested from
Greek National Archive of PhD Theses
Base URL
phdtheses.ekt.gr/eadd_oai/request
Last updated
2026-11-18
Source record
OAI-PMH GetRecord
citation

Gkikas, Vasileios; Γκίκας, Βασίλειος. Σχεδιασμός άμεσης υποστήριξης σε θέσεις συμβολής σηράγγων. National Technical University of Athens (NTUA), 2022. http://hdl.handle.net/10442/hedi/53825