Investigation of optimized design and operation of ship electric power system with emphasis on the generation subsystem
Abstract
dc:descriptionTraditionally, on ships, consumers are supplied by energy systems consisting of generating sets that contribute proportionally to their rated power. As shipping becomes more competitive and environmental regulations are already being imposed, it has become necessary to examine more economical architectures. Among them, shaft generators and electric propulsion are gaining ground, while alternative energy sources are becoming more attractive. However, these technologies have their own particularities, which, in order to constitute a worthwhile investment, require proper integration and management. In this doctoral dissertation, the benefits of adopting shaft generators were investigated and new load distribution methods were proposed that contribute to a significant increase in the operational performance of a ship. Also, many cost aspects were taken into account and a valuable tool was produced to assist in the design of an electrical power generation plant. Initially, traditional electricity generation facilities with diesel engine generating sets were compared with hybrid facilities that also include shaft generators. The use of the latter was found to be very beneficial, since it allows a significant increase in the safe operating area of the installation, enabling the ship to expand its operational profile without risk to the equipment. Additionally, a notable reduction in fuel consumption – and therefore in exhaust emissions – was achieved, reducing the overall operating cost of the ship. This is mainly observed when the ship supplies large electrical loads, such as during loading / unloading, refueling at sea, etc., and in some cases achieves an improvement of up to 12.7%. If overloading of the engines is allowed and increased exhaust emissions are tolerated, this improvement can reach 24.3%. Subsequently, a new algorithm was developed, based on the Lagrange method, for the optimal load distribution between diesel generators and shaft generators of various types and sizes. This was compared to the classical proportional allocation method, which is widely used, and was found to achieve an additional gain of 4.2% with normal generator loading and 5.3% with overloading. This algorithm was gradually enhanced by emphasizing the technical constraints of the equipment and also by including more cost factors, such as maintenance and start-up costs. IMO environmental constraints were also taken into account. Expanding its scope, this study went beyond power generation facilities and extended to ship speed optimization for demand management. Using dynamic programming and real operational equipment data, various realistic scenarios were examined, starting with a traditional platform with diesel generators and propulsion engines and gradually introducing optimal power distribution, environmental constraints, optimal propulsion control and shaft generators. It became evident that each upgrade improves various aspects of the ship's operation, such as electrical power generation, efficiency and exhaust emissions, showing savings of up to 3.8%. All these calculation systems can be integrated into any existing ship with negligible financial burden. Further extension of the algorithm includes the costs of fuel and lubricants, redundant units and reliability, purchase and installation, maintenance and crew payroll. Borrowing and investment systems are also considered and a realistic profile of a real ship is used, together with real equipment specifications. All this is covered by a suitable new calculation method, which uses exhaustive calculations of all possible combinations of machinery and the memoization method to increase its speed. This development has produced a very powerful tool for the designer of a ship and of her propulsion and power plant, allowing the optimal selection of machinery, so that they are now suitable for a range of real requirements. At the same time, a way of measuring the economic viability of such an investment was introduced. This is the cost difference of the maximum available capital per power unit of installed shaft generator, which shows whether the additional capital for this particular investment can be amortized by the operating cost reduction. Together with sensitivity analysis in terms of fuel costs, operational life, interest rate, propulsion power duration curve etc., it becomes clear that the installation of shaft generators can be economically viable, especially for long voyages at low speed.
Degree
thesis:*- Grantor dc:publisher
- National Technical University of Athens (NTUA)
- Year dc:date
- 2025
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Michalopoulos, Panayiotis
- Μιχαλόπουλος, Παναγιώτης
Subjects
dc:subject × 26- Σχεδίαση ηλεκτροπαραγωγού εγκατάστασης
- Επιλογή γεννητριών
- Κατανάλωση καυσίμου
- Βελτιστοποίηση Lagrange
- Προφίλ φορτίου
- Κόστος αξιοπιστίας
- Επιστροφή επένδυσης
- Διαχείριση ζήτησης
- Δυναμικός προγραμματισμός
- Αξονικές γεννήτριες
- Power-plant design
- Generator selection
- Fuel consumption
- Lagrange optimization
- Load profile
- Reliability cost
- Return on investment
- Demand side management
- Dynamic programming
- Shaft generators
- Επιστήμη Ηλεκτρολόγου Μηχανικού, Ηλεκτρονικού Μηχανικού, Μηχανικού Η/Υ
- Επιστήμες Μηχανικού και Τεχνολογία
- Ηλεκτρική και Ηλεκτρονική μηχανική
- Electrical Engineering, Electronic Engineering, Information Engineering
- Engineering and Technology
- Electrical and Electronic Engineering
Rights
- Language dc:language
- eng
Identifiers
dc:identifier.*- Identifier
- 10.12681/eadd/62617