Back to search

Iowa State University

Performance evaluation and finite element verification of an ultra-high performance concrete pi-girder bridge

Abstract

dc:description.abstract

<p>The Jakway Park Bridge in Buchanan County, Iowa is the first bridge constructed with a new prestesssed girder system composed of precast Ultra-High Performance Concrete (UHPC). These girders employ an integral deck to facilitate construction and are referred to as pi-girders for the resemblance of their cross-section to the Greek letter, "π". The evolution of the girder geometry, simplifying assumptions, and finite element analysis techniques used in design of the bridge are examined, and the results of laboratory and live load testing are presented to quantify behavior. The effectiveness of the finite element analysis, structural performance of the bridge, including live load distribution, is evaluated to provide guidance for future designs employing these girders.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
thesis
Department dc:contributor.department
Department of Civil, Construction and Environmental Engineering
Year dc:date.issued
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Berg, Owen
Advisor dc:contributor.advisor
  • Jon M. Rouse

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Identifier
archive/lib.dr.iastate.edu/etd/11802/
Dc Identifier Other
2784
2807982
Mods Identifier Filename
archive/lib.dr.iastate.edu/etd/11802/Berg_iastate_0097M_11100.pdf|||Fri Jan 14 18:59:00 UTC 2022

Chain of custody

source
Harvested from
Iowa State University
Base URL
dr.lib.iastate.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Berg, Owen. Performance evaluation and finite element verification of an ultra-high performance concrete pi-girder bridge. thesis thesis, 2010. https://doi.org/10.31274/etd-180810-3088