Back to search

Iowa State University

Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects

Abstract

dc:description.abstract

<p>By integrating Linear Scheduling Method (LSM) concepts with risk modeling methods and using state-of-the practice contractual risk management, a framework is proposed to manage geotechnical uncertainty in construction projects. LSM provides an effective tool for graphically depicting a design-build (DB) project’s schedule in terms of both estimated and actual production rates in relation to physical locations on the project. When the LSM tool is combined with risk analysis calculations and geotechnical site information, it provides a vehicle for effectively allocating geotechnical risk, and when used forensically, furnishes a means to visually quantify delays during dispute resolution.</p> <p>The use of alternative methods for quantifying and managing geotechnical risks is explored by incorporating the LSM format and DB procurement along with the implementation of contractual risk management tools, providing a framework for managing the uncertainty of underground conditions in a way that increases the effectiveness of communication and analysis.</p> <p>A forensic approach is also proposed using the LSM format to visualize actual production data drawn from daily work reports in a single chart to accurately depict the events that occurred during construction, thus demonstrating the potential of the LSM format as a communication tool to draw conclusions from information that otherwise would not be apparent using the Critical Path Method (CPM). Additionally, a risk management and planning approach is also explored with the use of LSM combined with stochastic simulations to represent the estimated impact of geotechnical risks and integrating it with the geological interpretation of the site.</p> <p>By integrating LSM, stochastic simulations for schedule risks, and state-of-the-practice contracting methods, the study contributes to the body of knowledge by providing an innovative approach to increase the effectiveness for managing the geotechnical risk in DB projects.</p>

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy
Level thesis:degree_level
dissertation
Discipline thesis:degree_discipline
Civil Engineering
Department dc:contributor.department
Department of Civil, Construction and Environmental Engineering
Year dc:date.issued
2017

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tapia, Ricardo
Advisor dc:contributor.advisor
  • Douglas D. Gransberg

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Identifier
archive/lib.dr.iastate.edu/etd/15435/
Dc Identifier Other
6442
11054780
Mods Identifier Filename
archive/lib.dr.iastate.edu/etd/15435/Tapia_iastate_0097E_16366.pdf|||Fri Jan 14 20:41:03 UTC 2022

Chain of custody

source
Harvested from
Iowa State University
Base URL
dr.lib.iastate.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Tapia, Ricardo. Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. dissertation thesis, 2017. https://doi.org/10.31274/etd-180810-5056