Iowa State University
The development and testing of new, single and multiple echelon, dynamic, capacitated, lot sizing heuristics
Abstract
dc:description.abstract<p>Three new heuristics and two random problem generators are introduced and tested. These heuristics and problem generators are associated with single and multiple echelon, dynamic, capacitated lot sizing problems, with or without setup times. These types of problems often occur in an MRP environment;First, the Dixon and Silver (DS) lot sizing heuristic was extended. The new, single echelon heuristic offers improved cost performance at a small computational expense. It incorporates newly developed perturbation factors that allow for multiple iterations of the DS heuristic. At the conclusion of all iterations, the lowest cost production plan is recalled. The second, single echelon heuristic developed and tested, the MG heuristic, is capable of solving large-scale, dynamic, capacitated, lot sizing problems, with or without setup times. This heuristic has three main sections: (A) Wagner-Whitin algorithm and a feasibility seeking subroutine; (B) a DS heuristic modified to allow for setup times; and (C) newly developed improvement algorithms that seek lower costs while maintaining feasibility;Comparison testing of the MG heuristic against other leading heuristics used a random problem generator to produce realistic, large-scale, single echelon problems. For even the largest group of problems tested, 4000 items and 25 periods, its average CPU time (on a DECstation 5000) was 1.0 minute. And, for all 216 problems tested, the MG heuristic's average solution costs were just 0.86% higher than the best heuristic against which it was tested, at 0.026 the computation time;The new, multiple echelon heuristic utilizes multiple iterations of a sequential top-down approach that combines single echelon approaches with a feasibility feedback mechanism to higher echelons. Additionally, the heuristic incorporates two cost modification procedures: (A) Blackburn and Millen's KCC procedure; and (B) newly developed holding cost adjustment factors, one for each echelon. The holding cost adjustment factors are available for application to each item on a particular echelon and assist the heuristic in finding a feasible solution to capacitated problems. Then, the best combination of factors is explored with a simulated annealing procedure. In comparison to other heuristics, encouraging test results were obtained for assembly problems produced using a new random problem generator.</p>
Degree
thesis:*- Name thesis:degree_name
- Doctor of Philosophy
- Level thesis:degree_level
- dissertation
- Department dc:contributor.department
- Department of Industrial and Manufacturing Systems Engineering
- Year dc:date.issued
- 1995
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- McCoy, Robert
- Advisors dc:contributor.advisor
-
- Douglas D. Gemmill
- Herbert T. David
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier URI
- https://dr.lib.iastate.edu/handle/20.500.12876/64134
- Identifier
- archive/lib.dr.iastate.edu/rtd/10933/
- Dc Identifier Other
-
11932
6423379 - Mods Identifier Filename
- archive/lib.dr.iastate.edu/rtd/10933/r_9531769.pdf|||Fri Jan 14 18:31:19 UTC 2022