Iowa State University
A comparison of design-bid-build and design-build project delivery methods on military construction projects
Abstract
dc:description.abstract<p>The US Army Corps of Engineers has adopted the design-build project delivery method as a means to produce military facilities faster and cheaper. An analysis was conducted on 119 military construction projects executed by the US Army Corps of Engineers. While design-build awards may be made earlier in the delivery of military construction projects the design-build project delivery method was shown to have larger contract time growth compared to design-bid-build projects. Military design-build projects experienced a lower total cost of change orders as well as a reduced change order cost associated with field changes.;Finally, statistical analysis demonstrated that no significant difference existed in design-build performance based on the type of facility being constructed. This result indicates that the design-build project delivery method will work equally well on all types of military construction projects.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- thesis
- Department dc:contributor.department
- Department of Civil, Construction and Environmental Engineering
- Year dc:date.issued
- 2007
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- McWhirt, Darren
- Advisors dc:contributor.advisor
-
- Edward Jaselskis
- Kelly Strong
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier URI
- https://dr.lib.iastate.edu/handle/20.500.12876/68095
- Identifier
- archive/lib.dr.iastate.edu/rtd/14556/
- Dc Identifier Other
-
15555
6984444 - Mods Identifier Filename
- archive/lib.dr.iastate.edu/rtd/14556/1443090.PDF|||Fri Jan 14 20:22:15 UTC 2022