Iowa State University
Utility cut repair techniques: investigation of improved utility cut repair techniques to reduce settlement in repaired areas, Phase II
Abstract
dc:description.abstract<p>Trench maintenance problems are caused by improper backfill placement and construction procedures. This thesis is part of a multi-phase research project that aims to improve long-term performance of utility cut restoration trenches. The goal of this research is to improve pavement patch life and reduce the maintenance of the repaired areas. The objectives were to use field-testing data, laboratory testing data, and long-term monitoring (elevation survey and FWD testing) to suggest and modify recommendations from Phase I and to identify the principles of trench subsurface settlement and load distribution in utility cut restoration areas by using instrumented trenches. The objectives were accomplished by monitoring local agency utility construction from Phase I, constructing and monitoring the recommended trenches from Phase I, and instrumenting trenches to monitor changes in temperature, pressure, moisture content, and settlement as a function of time to determine the influences of seasonal changes on the utility cut performance.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- thesis
- Department dc:contributor.department
- Department of Civil, Construction and Environmental Engineering
- Year dc:date.issued
- 2008
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Videkovich, Kathlyn
- Advisors dc:contributor.advisor
-
- Vernon R. Schaefer
- Mohannad Suleiman
- Halil Ceylan
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier URI
- https://dr.lib.iastate.edu/handle/20.500.12876/69093
- Identifier
- archive/lib.dr.iastate.edu/rtd/15459/
- Dc Identifier Other
-
16458
7029062 - Mods Identifier Filename
- archive/lib.dr.iastate.edu/rtd/15459/1454644.PDF|||Fri Jan 14 20:41:20 UTC 2022