Back to search

Iowa State University

Investigation of improved utility cut repair techniques to reduce settlement in repaired areas

Abstract

dc:description.abstract

<p>Pavement settlement occurring in and around utility cuts is a common problem that draws significant resources for maintenance. Recently, a survey as well as field and laboratory investigations were carried out to identify the factors that contribute to the settlement of utility cut restorations in pavement sections throughout Iowa. Survey responses were received from seven cities in Iowa. Responses indicate: imported granular material generally is used as backfill material, utility cut restorations often last less than two years, and during construction limited quality control is used. To evaluate the performance of existing utility cuts, and document and evaluate the construction practices across Iowa, seven cities were visited where utility cut restorations were observed. From these observations it was concluded that: backfill material varies from one city to another, backfill lift thickness often exceeds 12 inches, and the backfill is often placed at or near the bulking moisture content. Backfill materials were subsequently characterized in the laboratory using gradation, specific gravity, relative density, and collapse tests. The collapse tests show that the backfill materials are placed in the field at moisture contents that have collapse potential ranging from approximately five to 25 percent. At three utility cut trenches the construction practices, backfill materials, and compaction process were documented and monitored for almost a year, using Falling Weight Deflectometer (FWD) and by measuring elevations. From the deflection data of the FWD it was observed that the area around the perimeter of the utility cut restoration showed the maximum deflection. This area, called the zone of influence, is a result of the native material surrounding the utility cut trench losing lateral support as excavation begins. Furthermore, this native material generally does not get re-compacted during utility cut restorations. The zone of influence was found to extend about two to three feet beyond the trench perimeter. Simple design and construction procedures using two different backfill materials and geosynthetic reinforcement are suggested to reduce the settlement problems around utility trenches. Future monitoring and evaluation of constructed trial trenches will further indicate the performance of utility cuts using these construction techniques.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
thesis
Discipline thesis:degree_discipline
Civil Engineering (Geotechnical Engineering)
Department dc:contributor.department
Department of Civil, Construction and Environmental Engineering
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Jensen, Kari

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Identifier
archive/lib.dr.iastate.edu/rtd/19116/
Dc Identifier Other
20115
18125122
Mods Identifier Filename
archive/lib.dr.iastate.edu/rtd/19116/Jensen_ISU_2005_J46.pdf|||Fri Jan 14 21:52:45 UTC 2022

Chain of custody

source
Harvested from
Iowa State University
Base URL
dr.lib.iastate.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Jensen, Kari. Investigation of improved utility cut repair techniques to reduce settlement in repaired areas. thesis thesis, 2005. https://dr.lib.iastate.edu/handle/20.500.12876/73091