Investigation of improved utility cut repair techniques to reduce settlement in repaired areas
Abstract
dc:description.abstract<p>Pavement settlement occurring in and around utility cuts is a common problem that draws significant resources for maintenance. Recently, a survey as well as field and laboratory investigations were carried out to identify the factors that contribute to the settlement of utility cut restorations in pavement sections throughout Iowa. Survey responses were received from seven cities in Iowa. Responses indicate: imported granular material generally is used as backfill material, utility cut restorations often last less than two years, and during construction limited quality control is used. To evaluate the performance of existing utility cuts, and document and evaluate the construction practices across Iowa, seven cities were visited where utility cut restorations were observed. From these observations it was concluded that: backfill material varies from one city to another, backfill lift thickness often exceeds 12 inches, and the backfill is often placed at or near the bulking moisture content. Backfill materials were subsequently characterized in the laboratory using gradation, specific gravity, relative density, and collapse tests. The collapse tests show that the backfill materials are placed in the field at moisture contents that have collapse potential ranging from approximately five to 25 percent. At three utility cut trenches the construction practices, backfill materials, and compaction process were documented and monitored for almost a year, using Falling Weight Deflectometer (FWD) and by measuring elevations. From the deflection data of the FWD it was observed that the area around the perimeter of the utility cut restoration showed the maximum deflection. This area, called the zone of influence, is a result of the native material surrounding the utility cut trench losing lateral support as excavation begins. Furthermore, this native material generally does not get re-compacted during utility cut restorations. The zone of influence was found to extend about two to three feet beyond the trench perimeter. Simple design and construction procedures using two different backfill materials and geosynthetic reinforcement are suggested to reduce the settlement problems around utility trenches. Future monitoring and evaluation of constructed trial trenches will further indicate the performance of utility cuts using these construction techniques.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- thesis
- Discipline thesis:degree_discipline
- Civil Engineering (Geotechnical Engineering)
- Department dc:contributor.department
- Department of Civil, Construction and Environmental Engineering
- Year dc:date.issued
- 2005
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Jensen, Kari
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier
- archive/lib.dr.iastate.edu/rtd/19116/
- Dc Identifier Other
-
20115
18125122 - Mods Identifier Filename
- archive/lib.dr.iastate.edu/rtd/19116/Jensen_ISU_2005_J46.pdf|||Fri Jan 14 21:52:45 UTC 2022