Abstract
dc:description.abstract<p>In this research, detailed level scheduling within a GT cell has been investigated. For detailed level scheduling within a GT cell two classes of procedures named operation scheduling and job-group scheduling procedure have been identified. Both the procedures were investigated using simulation of randomly generated job sets;Six heuristic criteria were investigated under operation scheduling. Two of these were found to be better than SPT for savings in setup time and throughput time;A procedure to recognize setup similarity prior to scheduling has been developed using similarity measures and clustering techniques. Five rules were developed for sequencing the subgroups formed by clustering;The utility of job-group scheduling procedure as a scheduling technique for a "future" GT cell has been discussed. Also, the utility of the procedure to study MRP-GT interactions and to establish release times and due dates have been discussed;An efficient FORTRAN based software has been developed to simulate a GT cell and evaluate scheduling rules.</p>
Degree
thesis:*- Name thesis:degree_name
- Doctor of Philosophy
- Level thesis:degree_level
- dissertation
- Department dc:contributor.department
- Department of Industrial and Manufacturing Systems Engineering
- Year dc:date.issued
- 1982
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Vaithianathan, Muthuraj
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier URI
- https://dr.lib.iastate.edu/handle/20.500.12876/80442
- Identifier
- archive/lib.dr.iastate.edu/rtd/7552/
- Dc Identifier Other
-
8551
6314533 - Mods Identifier Filename
- archive/lib.dr.iastate.edu/rtd/7552/r_8224344.pdf|||Sat Jan 15 01:50:05 UTC 2022