The Effect of Alternative Delivery on Accelerated Bridge Construction Projects

Abstract

dc:description.abstract

<p>Accelerated Bridge Construction (ABC) is an option that state transportation agencies can use to repair or replace bridges in a shorter amount of time. This option offers a way to save on user costs and to increase the safety of the traveling public and the workers by reducing the amount of time that construction is ongoing. In the past thirty years, several alternatives to design-bid-build (DBB) project delivery have begun to be used by state transportation agencies, such as design build, construction manager general contractor and public private partnerships. The focus of this thesis merges these concepts to investigate what methods and technologies are used for ABC with alternative project delivery, and how alternative delivery methods allow for more innovation.Data was collected through a desk scan, survey, and case studies. The analysis that was conducted showed that agencies using alternative delivery methods are able to increase the applicability of geotechnical and construction (e.g. self-propelled modular transport) technologies for ABC. While agencies using DBB tend to focus on structural technologies such as precast beams. Case studies showed that alternative delivery methods provide more flexibility to the contractor, which allows them to use their experience to find innovative solutions. Further, alternative delivery methods allow for an increase in collaboration between designers, contractors and state transportation agencies.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
dissertation
Discipline thesis:degree_discipline
Civil Engineering (Construction Engineering and Management)
Department dc:contributor.department
Department of Civil, Construction and Environmental Engineering
Year dc:date.issued
2020

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Volk, Michael
Advisor dc:contributor.advisor
  • Jennifer Shane

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Identifier
archive/lib.dr.iastate.edu/etd/18420/
Dc Identifier Other
9427
21104878
Mods Identifier Filename
archive/lib.dr.iastate.edu/etd/18420/Volk_iastate_0097M_19211.pdf|||Fri Jan 14 21:41:49 UTC 2022

Chain of custody

source
Harvested from
Iowa State University
Base URL
dr.lib.iastate.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Volk, Michael. The Effect of Alternative Delivery on Accelerated Bridge Construction Projects. dissertation thesis, 2020. https://doi.org/10.31274/etd-20210114-155