Back to search

Iowa State University

A process for scheduling urban interchange reconstruction

Abstract

dc:description.abstract

<p>The researchers from Iowa State University worked with the Iowa DOT, and developed computer-based schedules for the corridor I235 using Microsoft Project 2000, to predict project completion, expose and adjust conflicts between trades or subcontractors, evaluate the effect of changes on project completion and cost, track projects' progress, and so on. This thesis will describe a method to create schedules for urban freeway interchange reconstruction projects and procedures and tables that assist with planning and accelerating. The use of the above is demonstrated in a case study: Martin Luther King Jr. (MLK) and Cottage Grove Avenue projects in the corridor I235</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
thesis
Discipline thesis:degree_discipline
Civil Engineering (Construction Engineering and Management)
Department dc:contributor.department
Department of Civil, Construction and Environmental Engineering
Year dc:date.issued
2002

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Li, Jingxi

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Identifier
archive/lib.dr.iastate.edu/rtd/20146/
Dc Identifier Other
21145
18792611
Mods Identifier Filename
archive/lib.dr.iastate.edu/rtd/20146/Li_ISU_2002_L497.pdf|||Fri Jan 14 22:20:16 UTC 2022

Chain of custody

source
Harvested from
Iowa State University
Base URL
dr.lib.iastate.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Li, Jingxi. A process for scheduling urban interchange reconstruction. thesis thesis, 2002. https://doi.org/10.31274/rtd-20200803-262