Iowa State University
The structured flow: The plan versus the agency on the Missouri River
Abstract
dc:description.abstractThe Army Corps of Engineers initially channelized the Missouri River in order to implement flood-control structures and create a navigable channel for barge traffic. Over the many decades that have transformed the Missouri River several problems have arisen due to the channelization. This thesis asked the question, was the plan to blame for the problems, or was the Corps of Engineers at fault. In order to answer that question several areas were reviewed and analyzed. First the plan itself was evaluated for successes and failures. The agency implementing the plan, the Corps of Engineers was also researched and evaluated. Interviews were conducted in order to get a better understanding of the Corps and the plan. I believe this research to be important in order to understand large-scale government plans and the agencies that implement them. Failures will continue to exist as long as the process remains unchecked and changes are not implemented.
Degree
thesis:*- Name thesis:degree_name
- Master of Community and Regional Planning
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Community and Regional Planning
- Department thesis:degree_department
- Department of Urban Planning and Development
- Year dc:date.issued
- 2001
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Samson, Jennifer Lynn
- Advisor dc:contributor.advisor
-
- Hamin, Elisabeth
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Repository record dc:identifier.uri
- https://dr.lib.iastate.edu/handle/20.500.12876/arY4LPQv