Iowa State University
A benchmark study for the Iowa Department of Transportation Construction Office
Abstract
dc:description.abstractThis research project was initiated by the Construction Office of the Iowa Department of Transportation to develop ways to measure the effectiveness of performance of all the construction offices, including the central office in Ames, the six transportation centers, and the twenty residencies. This project was presented to the Highway Research Board on March 31, 1995, at which time the Board provided its approval. The contract between Iowa State University and the Iowa DOT was approved on May 1, 1995. The objectives for this project were to assist the Iowa DOT Construction Office as they identify key processes for continuous improvement and develop performance measures and benchmark data for use in the continuous improvement process.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Civil Engineering
- Department thesis:degree_department
- Department of Civil, Construction and Environmental Engineering
- Year dc:date.issued
- 1996
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- McCollough, Laura Anne Wingert
- Advisor dc:contributor.advisor
-
- Chase, Gerald W.
Rights
- Language dc:language.iso
- en