A Comparative Study on Projected and Actual Manufacturing Times to Identify the Source Of Customer Delinquency

Abstract

dc:description.abstract

This study was an investigation of the projected lead time and the actual lead time for a part manufactured at Tri-Industries Inc., Terre Haute, Indiana. The research was focused on a single part produced in Tri-Industries. The problem was that there is a difference in the projected lead time and the actual lead time of the part under investigation. The actual lead time was longer than projected lead time, which resulted in the company being delinquent in customer delivery. This investigation was conducted to find out the source for customer delinquency for a single part in Tri-Industries. The conclusion was intended to help the company in a broader investigation into eliminating customer delinquency of the whole plant. The part chosen for the study was Combustor Housing. The data for the study was obtained from the Tri-Industries database. The manufacturing time was broken up into setup time, run time, and wait time. The researcher obtained the actual manufacturing time for the part, combustor housing, for a period of 1 year from the database. The arithmetic mean and standard deviation were calculated and compared with the projected time. Z-value was calculated to find the deviation of the projected time from the actual mean value. The researcher, by analysis of the data collected for the combustor housing,. identified increased wait time as the source for delay in manufacturing. The amount of wait time is such that it is concluded that the wait time is the primary cause for delinquency in the part investigated. It is suggested that the increased wait time may be a generalized cause of customer delinquency for many or all of the products of Trilndustries.

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
Thesis
Discipline thesis:degree_discipline
Industrial Engineering

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Kuruppalil, Zaki
Contributors dc:contributor
  • Gordon Minty
  • Michael Hayden
  • S. Joseph Freeze

Identifiers

dc:identifier.*
Repository record dc:identifier
https://scholars.indianastate.edu/etds/3473

Chain of custody

source
Harvested from
Indiana State University
Base URL
scholars.indianastate.edu/do/oai/
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
related terms
citation

Kuruppalil, Zaki. A Comparative Study on Projected and Actual Manufacturing Times to Identify the Source Of Customer Delinquency. Thesis thesis, https://scholars.indianastate.edu/etds/3473