Johns Hopkins University
Stochastic Co-optimization for National Transmission Planning Under Environmental Regulation
Abstract
dc:description.abstractTransmission planners must make investment decisions in response to rapid changes impacting the US electric power system to ensure that power remains affordable and reliable. Over the past 20 years, deregulation, large additions of renewable energy, and an evolving environmental policy have radically altered the already uncertain landscape of the electric grid, complicating transmission expansion planning. Stochastic co-optimization planning is modeling approach that allows planners to consider important interactions between transmission and generation resources, at minimum cost, across an uncertain future. This thesis uses a two stage stochastic co-optimization planning model to demonstrate its benefits over conventional planning approaches towards national transmission planning. Environmental regulations including the Cross State Air Pollution Rule and State Renewable Portfolio Standards are explicitly simulated in the model. This application demonstrates that generation and transmission resources impact one another. In particular, transmission investments were made to improve access in regions with higher quality wind resources, allowing more wind capacity to be installed in that region than in conventional planning approaches. Recognizing and exploiting these interactions can help reduce the costs of developing and operating the system. When generation and transmission expansion are performed separately, transmission additions can reduce generation cost only through improved dispatch. However when they are planned together, previously inaccessible resources can be accessed. This allowed up to $62.25 billion savings on generation, of which $37.11 came from capital costs savings while $25.14 saved on operations. Even with increased transmission investment costs increased there is a total savings of 1.8% or $17.8 billion present worth on investments and operations. Additionally the application of stochastic co-optimization for transmission planning shows where stochastic programming is and is not helpful. On one hand, economic uncertainties (load growth and fuel prices) have little impact on first stage transmission investments, which are made prior to 2023. But the result that alternative air pollution and renewable policies do significantly affect which transmission investments are attractive in the short run indicate that it is likely that considering regulatory uncertainties would affect near term decisions (as was shown previously for a national model without transmission by Hu and Hobbs, 2010).
Degree
thesis:*- Name thesis:degree_name
- M.S.E.
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Environmental Engineering
- Department thesis:degree_department
- Geography and Environmental Engineering
- Grantor dc:publisher
- Johns Hopkins University
- Year dc:date.issued
- 2014
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ho, Jonathan L.
- Committee member dc:contributor.committeemember
-
- Hobbs, Benjamin F.
Subjects
dc:subject × 5Rights
- Language dc:language
- en
Identifiers
dc:identifier.*- Repository record dc:identifier.uri
- http://jhir.library.jhu.edu/handle/1774.2/37101