Back to search

Kansas State University

The BCS algorithm: optimizing crane schedules on multiple bays in conjunction with continuous time simulation

Abstract

dc:description.abstract

This thesis introduces the Bay Crane Scheduling (BCS) problem and related BCS algorithm. The purpose of this algorithm is to optimize the assignment of jobs to overhead cranes as well as the sequence in which each crane performs its assigned jobs. This problem is unique from other Overhead Crane Scheduling (OCS) problems through its increased complexity. Up until now, OCS problems involve a set number of cranes operating in a single common area, referred to as a bay, and are unable to pass over each other. The BCS problem involves a varying number of active cranes operating in multiple bays. Each crane is allowed to move from one bay to the next, through specific locations called bridges. This is crucial to completing certain “special” jobs that require two cranes operating in unison to transport an item. The BCS algorithm employs two continuous time simulations in conjunction with an initial job-assignment algorithm and a Simulated Annealing (SA) improvement heuristic in order to minimize the non-productive crane time, while avoiding overloading any crane. To the extent of the author’s knowledge, this is the first time a continuous time simulation has been used to model an OC system. The BCS algorithm was originally developed for a large manufacturing facility, and when it was tested against the facility’s current scheduling methods, it shows a 20% improvement in the overall active crane time required to complete equivalent set of jobs. This improved efficiency is crucial to the manufacturing facility being able to increase its production rate without the addition of new cranes. In addition, BCS is statistically shown to be superior to the current strategy. The results from BCS are substantial and practitioners are encouraged to utilize BCS’s methodologies to improve other overhead crane systems.

Degree

thesis:*
Level thesis:degree_level
Masters
Department dc:contributor.department
Department of Industrial & Manufacturing Systems Engineering
Grantor dc:publisher
Kansas State University
Year dc:date.issued
2013

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Strieby, James
Advisor dc:description.advisor
  • Todd W. Easton

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • © the author. This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/2097/16175

Chain of custody

source
Harvested from
Kansas State University
Base URL
krex.k-state.edu/server/oai/request
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Strieby, James. The BCS algorithm: optimizing crane schedules on multiple bays in conjunction with continuous time simulation. Masters thesis, Kansas State University, 2013. https://hdl.handle.net/2097/16175