Back to search

Kansas State University

A green infrastructure retrofit for the upper Campus Creek watershed parking lots

Abstract

dc:description.abstract

Flash flooding and poor water quality are significant issues for Campus Creek. Studies have shown that green infrastructure can mitigate certain stormwater runoff related issues like flooding and poor water quality, but there are opportunities to further explore how retrofitting parking lots on campus with green infrastructure can make a difference. Thus, this project explores how the northwestern parking lots of the Campus Creek Watershed can be retrofitted with green infrastructure to help reduce stormwater runoff quantity, peak rate, and pollutant load. The study area was selected because it is located within the headwaters of the watershed. The specific parking lots of focus include Bill Snyder Stadium, Peter’s Recreation Center, and the northern portion of the Jardine Apartment Complex. The opportunities and constraints of each site were studied through site analysis. The proposed green infrastructure solutions included bioretention, rainwater harvesting mechanisms, tree canopy, and permeable pavement. The solutions were designed in areas where they could have the most beneficial impact on stormwater management. Once the design of the green infrastructure solutions was complete, additional modeling was conducted to determine their effectiveness. This project found that the proposed green infrastructure measures, together, can decrease annual runoff quantity by 54.5%, annual pollutant load by 84.7%, and the peak rate of runoff by 81% for a 5-Year Storm (3 hour duration), 10-Year Storm (2 hour duration), 25-Year Storm (90 minute duration), 50-Year Storm (1 hour duration), and 100-Year Storm (30 minute duration).

Degree

thesis:*
Level thesis:degree_level
Masters
Department dc:contributor.department
Department of Landscape Architecture/Regional and Community Planning
Grantor dc:publisher
Kansas State University
Year dc:date.issued
2022

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Sobotka, Victor
Advisor dc:description.advisor
  • Jessica Canfield

Subjects

dc:subject × 4

Rights

dc:rights
Statement dc:rights
  • © the author. This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).
Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/2097/42212

Chain of custody

source
Harvested from
Kansas State University
Base URL
krex.k-state.edu/server/oai/request
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Sobotka, Victor. A green infrastructure retrofit for the upper Campus Creek watershed parking lots. Masters thesis, Kansas State University, 2022. https://hdl.handle.net/2097/42212