Abstract
dc:description.abstractIn 2013, The Kingdom of Saudi Arabia had a US$1.6 Billion deal to link the kingdom with Egypt via a 3,000MW- interconnection power grid. Unfortunately, the project has not been implemented on the ground because of the technical consideration. The principal objective of this paper is to provide a proper technical suggestion that will help to implement The Saudi- Egyptian Cross-Border Interconnections Power Network on the ground using systems engineering process.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- Campus Access only Research Projects
- Discipline thesis:degree_discipline
- Systems Engineering
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Eed, Rafat
Subjects
dc:subject × 2Identifiers
dc:identifier.*- Repository record dc:identifier
- https://digitalcommons.lmu.edu/etd/330