Back to search

University of Manitoba

Investigation of the ice dam at Sundance Rapids on the Lower Nelson River

Abstract

dc:description.abstract

Hydropower production is significantly reduced during the winter months at the Limestone Generating Station, located on the Lower Nelson River in northern Manitoba, due to an ice dam that forms 3.25 kilometers downstream at Sundance Rapids. This research investigates the annual ice dam at Sundance Rapids, focusing on identifying trends between the severity and timing of ice dam formation and release with regards to meteorological and hydrologic conditions. The absence of site-specific data in previous studies has limited progress on modelling the ice dam and exploring ice mitigation strategies to optimize power generation. The ice dam has been monitored over the 2019/2020 winter season through the establishment of a comprehensive field monitoring program, which included a weather station, trail cameras, water level loggers and water temperature sensors. Where traditional site surveys are considered too dangerous, photogrammetry and large-scale particle image velocimetry techniques were tested as a method for collecting quantitative measurements of the physical ice dam and estimating water velocities near the ice dam. The monitoring identified a strong thermal response of the ice dam, where decay/release periods generally occurred when air temperatures increased above -15°C, often coinciding with large changes in air temperature (ΔT ~20°C). As a continuation of previous work, a CRISSP2D model has been evaluated using the 2019/2020 field data. Deficiencies were found in the model’s ability to simulate anchor ice release events, and further analysis identified shortfalls in the energy budget calculations. Simulation results provided insight to the importance of a moving zero-degree isotherm in the prediction of ice dam decay/release events. The initial findings of this research provide a basis for future work to improve numerical modelling capabilities of pertinent ice processes and pursue short- and long-term ice mitigation strategies.

Degree

thesis:*
Level thesis:degree_level
Master of Science (M.Sc.)
Discipline thesis:degree_discipline
Civil Engineering
Year dc:date.issued
2021

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Peters, Brittany
Advisor dc:contributor.supervisor
  • Dow, Karen (Civil Engineering) Malenchak, Jarrod (Civil Engineering)
Committee members dc:contributor.committeemember
  • Clark, Shawn (Civil Engineering)
  • Asadzadeh, Masoud (Civil Engineering)

Subjects

dc:subject × 1

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1993/35444

Chain of custody

source
Harvested from
University of Manitoba
Base URL
mspace.lib.umanitoba.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Peters, Brittany. Investigation of the ice dam at Sundance Rapids on the Lower Nelson River. Master of Science (M.Sc.) thesis, 2021. http://hdl.handle.net/1993/35444