Barriers to aboriginal participation in environmental assessment: a case study of the Wuskwatim generating station, Manitoba
Abstract
dc:description.abstractPublic participation is an important aspect of Environmental Assessment (EA) processes where the public can have an influence on decisions about development affecting them or their surrounding environment. A case study was conducted on the Wuskwatim Generating Station and Transmission Line Project EA process in order to identify barriers to participation faced by Aboriginal publics. Nine general barrier types were identified including: resource deficiencies, accessibility, information deficiencies, communication barriers, inadequate consultation, timing and scheduling constraints, lack of trust, lack of understanding, and coercion and control of dissent. The findings indicate most barriers faced by Aboriginal publics were procedural in nature and may be addressed through improvements in the design and implementation of participatory processes. A number of interrelationships were noted among barrier types suggesting that barriers to participation cannot be addressed in an isolated manner. Recommendations to improve future EA process and areas requiring further research are also discussed.
Degree
thesis:*- Level thesis:degree_level
- Master of Natural Resources Management (M.N.R.M.)
- Discipline thesis:degree_discipline
- Natural Resources Management
- Year dc:date.issued
- 2011
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Foth, Michael
- Advisor dc:contributor.supervisor
-
- Sinclair, A. John (Natural Resources Institute)
- Committee members dc:contributor.committeemember
-
- Davidson-Hunt, Iain (Natural Resources Institute)
- Diduck, Alan (Natural Resources Institute)
- Fitzpatrick, Patricia (University of Winnipeg)
Subjects
dc:subject × 2Rights
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1993/4935