MODELING AND SIMULATION OF A SEMICONDUCTOR MANUFACTURING FAB FOR CYCLE TIME ANALYSIS
Abstract
dc:description.abstractThe goal of the thesis is to conduct a study of the effects of scheduling policies and machine failures on the manufacturing cycle time of the Integrated Circuit (IC) manufacturing process for two processor chips, namely Skylake and Kabylake, manufactured by Intel. The fab simulation model was developed as First in First Out (FIFO), Shortest Processing Time (SPT), Priority based (PB), and Failure FIFO (machine failures) model, and the average cycle times and queue waiting times under the four scheduling policy models were compared for both the Skylake and Kabylake wafers. The study revealed that scheduling policies SPT and PB increased the average cycle time for Skylake wafers while decreasing the average cycle time for the Kabylake wafers, when compared to the base FIFO model. Machine failures increased the average cycle time for both types of wafers.
Degree
thesis:*- Department dc:contributor.department
- Systems Engineering
- Grantor dc:publisher
- Digital Repository at the University of Maryland
- Year dc:date.issued
- 2018
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Shinde, Aditya Ramaji
- Advisor dc:contributor.advisor
-
- Fu, Michael
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier
- https://doi.org/10.13016/M23X83P7H