McMaster University
Modeling and Assessment of Emergency Mitigation Preparedness & Vulnerability for External Events in Nuclear Power Plants
Abstract
dc:description.abstractThesis Abstract Current Nuclear Power Plant (NPP) design does not account for Beyond Design Basis Events (BDBEs) and thus lack the provisions to effectively mitigates complete loss of AC power and total loss of heat sink. Furthermore, parametric models used in PRA studies to assess Nuclear Power Plant’s safety risk for BDBE and External Events (EE) have significant limitations and proved ineffective to provide solutions on how to mitigate in BDBE or EEs situations. The Fukushima accident is a good example where PRA assessments did not provide the necessary means to cool or contain the reactors effectively. In this thesis, Emergency Mitigation Preparedness (EMP) model and assessment is proposed. The EMP model is objective and practical in evaluating NPP’s mitigation readiness in BDBE and EEs situations and provide a practical NPP Vulnerability indicator gauge which can potentially be used in risk-informed decisions. This will aid further in the NPP to improve in areas of emergency planning, enhance site and reactor design and improve workers safety and readiness to execute effective mitigation procedures and emergency plans.
Degree
thesis:*- Department dc:contributor.department
- Engineering Physics and Nuclear Engineering
- Year dc:date.issued
- 2014
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Assi, Ahmad
- Advisor dc:contributor.advisor
-
- Luxat, John
Subjects
dc:subject × 8Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier URI
- https://doi.org/10.71548/15502