Back to search

University of Missouri--Columbia

Use of incentive/disincentive contracting to mitigate work zone traffic impacts

Abstract

dc:description.abstract

[ACCESS RESTRICTED TO THE UNIVERSITY OF MISSOURI AT AUTHOR'S REQUEST.] Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, "Did the costs of the actual work zone impacts that were avoided justify the incentives paid?" This paper answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial‐closure projects and detour volumes and routes for full‐closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from the project budget and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that contribute to the success of I/D contracts. Overall, in terms of work zone impact mitigation, I/D contracts are very beneficial at a relatively low cost.

Degree

thesis:*
Name thesis:degree_name
M.S.
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Civil and environmental engineering (MU)
Grantor dc:publisher
University of Missouri--Columbia
Year dc:date.issued
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Mackley, Andrew R.
Advisors dc:contributor.advisor
  • Sun, Carlos
  • Edara, Praveen K. (Praveen Kumar)

Subjects

dc:subject × 4

Rights

dc:rights
Statement dc:rights
  • Access to files is limited to the campuses of the University of Missouri with SSO login.
Language dc:language.iso
eng, English

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10355/33248

Chain of custody

source
Harvested from
University of Missouri
Base URL
mospace.umsystem.edu/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Mackley, Andrew R.. Use of incentive/disincentive contracting to mitigate work zone traffic impacts. Masters thesis, University of Missouri--Columbia, 2012. https://hdl.handle.net/10355/33248