Back to search

Massachusetts Institute of Technology

Power, Land, and the Limits of Reshoring: Infrastructure Sequencing and the New Geography of U.S. Industrial Development

Abstract

dc:description.abstract

The United States is undergoing a renewed push toward domestic industrial production driven by geopolitical fragmentation, supply-chain disruptions, automation, and federal industrial policy. Despite unprecedented levels of announced reshoring investment, realized manufacturing output growth has slowed, revealing a growing gap between intent and execution. This thesis argues that this divergence is not cyclical, but structural. Specifically, it contends that U.S. reshoring is constrained less by capital availability or corporate willingness than by regional capacity to deliver developmentready land and electrical power at scale, in the correct sequence, and within commercially viable timelines. Drawing on reshoring data, trade-flow analysis, industrial real estate research, and utility system planning documents, the thesis demonstrates how land-use constraints, grid congestion, interconnection delays, and fragmented institutional coordination have emerged as binding limits on industrial feasibility. The analysis develops a feasibility framework that links land readiness, logistics infrastructure, construction economics, and energy generation, transmission, and utility sequencing to reshoring outcomes. This framework is applied through a case study of Apex Industrial Park in Southern Nevada, which illustrates how anticipatory infrastructure investment, large-scale industrial zoning, and coordinated utility planning can convert reshoring demand into operational capacity. By integrating national data with a place-based case study, this research provides a structured approach for evaluating where industrial reshoring is likely to succeed and where structural constraints will continue to limit execution, with implications for developers, investors, and policymakers.

Degree

thesis:*
Name thesis:degree_name
Master
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Deng, Larry
Advisor dc:contributor.advisor
  • Torous, Walter

Rights

dc:rights
Statement dc:rights
  • In Copyright - Educational Use Permitted
  • Copyright retained by author(s)

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/1721.1/165547

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
related terms
citation

Deng, Larry. Power, Land, and the Limits of Reshoring: Infrastructure Sequencing and the New Geography of U.S. Industrial Development. Massachusetts Institute of Technology, 2026. https://hdl.handle.net/1721.1/165547