From Byproduct to Benefit: A Case for Waste Heat Recovery Planning in Pennsylvania’s Data Centers

Abstract

dc:description.abstract

Waste heat is a byproduct of data center (DC) operations. Nearly all of the electricity a facility consumes is converted to heat that the cooling system must move out of the facility to keep computing equipment within safe operating temperatures. In the United States, the heat is typically rejected to the atmosphere while nearby homes, greenhouses, public buildings, and industrial preheating processes continue to burn fuel to generate heat the data centers next door already produce. Pennsylvania is experiencing a substantial increase in data center development, particularly in the central and southeastern regions. As of April 2026, these regions contain roughly 30 active facilities, four under construction, and 37 in the planning pipeline, nearly doubling the existing facilities. Most of the new projects under construction are hyperscale campuses. Data centers are typically sited for proximity to fiber networks, power capacity, and water access. These factors, combined with the high demand for compute from nearby cities (New York, Philadelphia, and Washington D.C.), make Pennsylvania an attractive location. However, waste heat recovery is rarely part of that calculation when planning these facilities, and once construction begins, the opportunity to recover and redistribute the heat to nearby offtakers diminishes. This thesis is written for county and municipal planners drafting ordinances and reviewing data center construction proposals within their jurisdiction. It addresses two questions. First, why should waste heat be treated as a recoverable planning resource rather than a disposal problem, and what thermal, spatial, economic, and regulatory conditions determine whether recovery is viable at a given site? Second, where and how can planners intervene during the development review process to shape recovery outcomes? Rather than offering site-specific engineering or financial analysis, the thesis draws on Pennsylvania's data center geography, agricultural and industrial base, heating climate, and emerging ordinance landscape to identify where recovery is viable, where the strongest offtaker matches sit, and where planners hold leverage. It closes with two interventions designed for adoption during local review: model ordinance language requiring a feasibility study at the 100 MW threshold and a county-level offtaker mapping workflow that grounds development review in local geography.

Degree

thesis:*
Name thesis:degree_name
Master
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Cooke, Summer H.
Advisor dc:contributor.advisor
  • Susskind, Lawrence

Rights

dc:rights
Statement dc:rights
  • In Copyright - Educational Use Permitted
  • Copyright retained by author(s)

Identifiers

dc:identifier.*
Repository record dc:identifier.uri
https://dspace.mit.edu/handle/1721.1/178344

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
related terms
citation

Cooke, Summer H.. From Byproduct to Benefit: A Case for Waste Heat Recovery Planning in Pennsylvania’s Data Centers. Massachusetts Institute of Technology, 2026. https://dspace.mit.edu/handle/1721.1/178344