INVESTIGATION OF LONG TERM PILLAR STABILITY IN AN ABANDONED GYPSUM MINE BASED ON DISSOLUTION MODELS

Abstract

dc:description.abstract

The abandoned Domtar Mine in Grand Rapids, MI underlies Interstate I-196. The mine operated for over 140 years, mining a 30-meter-deep, four-meter thick gypsum seam. In 2000, the mine was abandoned with the removal of the mine’s dewatering pumps allowing groundwater to flood the mine. The initial flooding resulted in saturating the mine pillars along with some amount of pillar dissolution. Overtime, gypsum dissolution would cease as the water becomes saturated with the gypsum dissolution products. The mine, however, is located adjacent to the Grand River and has groundwater moving through the mine resulting in the potential for continuing dissolution. The stability of the mine relies on the support pillars, which are being reduced in size due to the dissolution. In this research, we analyzed the long term stability of the Mine’s pillars. Samples from a quarry that mined the same gypsum seam were obtained. The moisture content of gypsum specimens was measured. The drying temperature according to ASTM standard, however, should not exceed 60 °C since heating can result in the transformation of gypsum to hemihydrate. The research investigated the temperature at which this transformation occurred using a helium pycnometer and determined that 80 °C can be used for gypsum’s moisture content measurements. The saturation process of specimens for mechanical testing was also investigated, concluding a saturated gypsum-water solution is required to minimize dissolution when saturating process. The dissolution rate of gypsum in both stagnant and flowing water was experimentally investigated, confirming the dissolution of pillars is a first-order kinetics reaction. The normalized dissolution coefficient for stagnant water was measured at 1.6×10-3 (cm/s) following a power law for flowing water. A simple analytical model was developed to predict the change of specimen’s diameter by time due to dissolution. A finite volume model was developed in FLAC3D to model the strength reduction of specimens due to both saturation and dissolution. The model was used to estimate the long-term stability of pillars in Domtar Mine. Finally, combining the analytical model and the numerical simulations, the time to failure of a pillar was estimated under different groundwater flow rates.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy in Civil Engineering (PhD)
Level thesis:degree_level
Open Access Dissertation
Discipline thesis:degree_discipline
Department of Civil and Environmental Engineering

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Sadeghiamirshahidi, Mohammadhossein
Committee members dc:contributor.committeemember
  • Thomas Oommen
  • Zhen Liu
  • Snehamoy Chatterjee
Contributors dc:contributor
  • Stanley J Vitton

Subjects

dc:subject × 8

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
Michigan Technological University
Base URL
digitalcommons.mtu.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Sadeghiamirshahidi, Mohammadhossein. INVESTIGATION OF LONG TERM PILLAR STABILITY IN AN ABANDONED GYPSUM MINE BASED ON DISSOLUTION MODELS. Open Access Dissertation thesis, https://doi.org/10.37099/mtu.dc.etdr/830