Back to search

Michigan Technological University

Selecting an electrical power source at the scoping level for a mining project

Abstract

dc:description.abstract

The electrical power source is a critical component of the scoping level study as the source affects both the project economics and timeline. This paper proposes a systematic approach to selecting an electrical power source for a new mine. Orvana Minerals Copperwood project is used as a case study. The Copperwood results show that the proposed scoping level approach is consistent with the subsequent much more detailed feasibility study.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Mining Engineering (MS)
Level thesis:degree_level
Master's report
Discipline thesis:degree_discipline
Department of Geological and Mining Engineering and Sciences

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Van Arsdale, Christopher Dawson
Contributors dc:contributor
  • Theodore J. Bornhorst
  • Stanley J Vitton

Subjects

dc:subject × 2

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
Michigan Technological University
Base URL
digitalcommons.mtu.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Van Arsdale, Christopher Dawson. Selecting an electrical power source at the scoping level for a mining project. Master's report thesis, https://doi.org/10.37099/mtu.dc.etds/542