Back to search
Nanyang Technological University
Design and construction of a 273Mld water treatment plant using immersed membrane technology
Abstract
dc:description.abstractTo share the experience in the design and construction of the first water treatment plant using membrane technology in Singapore, including the design considerations stage to the supervision of the construction of the various treatment facilities and the problems encountered.
Degree
thesis:*- College dc:contributor.school
- School of Civil and Environmental Engineering
- Year dc:date.issued
- 2004
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ooi, Oon Hee.
- Advisor dc:contributor.supervisor
-
- Lim, Teik Thye
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Nanyang Technological University
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10356/11972