Abstract
dc:description.abstractReview the methods for estimating gap acceptance and to estimate the critical gap at unsignalised T- intersections in Singapore, focusing on three movements: left turn from the minor road, right turn from the minor road and right turn from the major road, covering 2-lane and 4-lane major roads in suburban (non-CBD) traffic conditions.
Degree
thesis:*- College dc:contributor.school
- School of Civil and Environmental Engineering
- Year dc:date.issued
- 2005
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Hlwan Moe Aye.
- Advisor dc:contributor.supervisor
-
- Tan, Yan Weng
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Nanyang Technological University
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10356/12263