Nanyang Technological University
Riprap protection and failure mechanisms at bridge piers
Abstract
dc:description.abstractThe main objectives of this thesis are to study the failure mechanisms of a riprap layer around a bridge pier, and to identify the characteristic parameters affecting riprap failure. The thesis consists of seven chapters. Chapter 1 introduces the background of pier scour problems, the necessity of research on riprap protection around bridge piers, and the aim and scope of the study. Chapter 2 reviews previous works on local scour and riprap protection around bridge piers. Chapter 3 provides the details of the experimental equipment and procedures of the study. Two series of experiments were conducted under both clear-water and live-bed conditions, with special emphasis on latter condition. The aim of the first series was to study the formation of the maximum scour depth in the absence of a riprap layer. The results were used as a basis for evaluating the performance of the riprap layer. The second series was to study the effect of a riprap layer placed around the pier on scouring. The latter series consisted of three main parts, and the results are presented and discussed in Chapters 4, 5 and 6, respectively.
Degree
thesis:*- College dc:contributor.school
- School of Civil and Structural Engineering
- Year dc:date.issued
- 1998
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lim, Foo Hoat.
- Advisor dc:contributor.supervisor
-
- Chiew, Yee Meng
Subjects
dc:subject × 1Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10356/13060