Back to search

Nanyang Technological University

Jacked pipes as retaining wall in underpass construction

Abstract

dc:description.abstract

Excavation of about 7 m depth under the Merdeka Bridge at the side of the Kallang River was carried out for the proposed underpass at the extension of Crawford Street in Singapore. The Merdeka Bridge which is part of the Nicoll Highway was opened to traffic throughout the construction of the proposed underpass. Since the construction was carried out under a very important structure and in poor ground conditions with thick soft clay layers of up to 40 m depth, a conservative and safe retaining system with staged excavation was adopted. An extensive and sound instrumentation scheme had been proposed and used for the monitoring of movements of the surrounding ground and Merdeka Bridge during the construction.

Degree

thesis:*
College dc:contributor.school
School of Civil and Structural Engineering
Year dc:date.issued
1999

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Jaysankar, R.
Advisor dc:contributor.supervisor
  • Wong, Kai Sin

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/13085

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Jaysankar, R.. Jacked pipes as retaining wall in underpass construction. 1999. https://hdl.handle.net/10356/13085