Problems encountered at the interface between piling and substructure construction

Abstract

dc:description.abstract

This report examines the potential disputes and interface problems among piling, excavation and building contractors with implications on the current practice of contracts award in Singapore. Many factors are considered when problems are encountered, the common ones being time, cost and the possible involvement of Third Party liabilities. Very often, inadequacies in the execution of the actual construction work has resulted in major foundation defects and failures. These inadequacies are often overlooked, as contractors usually tend to be more concerned with accumulating savings on cost and time. However these savings would not be justified if substantial rectification works were required to correct the foundation problems. The four case histories in this report will highlight some of these problems.

Degree

thesis:*
College dc:contributor.school
School of Civil and Structural Engineering
Year dc:date.issued
1998

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Chew, Danny Poh Huat.
Advisor dc:contributor.supervisor
  • Wong, Kai Sin

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/13086

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Chew, Danny Poh Huat.. Problems encountered at the interface between piling and substructure construction. 1998. https://hdl.handle.net/10356/13086