Back to search

Nanyang Technological University

Evaluation of settlement of bored piles

Abstract

dc:description.abstract

The pile-soil interaction problem is very complex and is not clearly understood. Much research has been performed on the subject of determination of the ultimate pile capacity and the prediction of settlement at working load conditions. Available theoretical calculations are usually based on ideal soil conditions such as purely cohesive or cohesionless soil conditions and simplified boundary conditions, and the use of soil and pile parameters for which their precise values are uncertain. Therefore an accurate prediction of the ultimate pile capacity and the pile settlement is difficult, if not impossible.

Degree

thesis:*
College dc:contributor.school
School of Civil and Structural Engineering
Year dc:date.issued
1999

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Lee, Christopher Choon Sun.
Advisor dc:contributor.supervisor
  • Chang, Ming Fang

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/13099

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Lee, Christopher Choon Sun.. Evaluation of settlement of bored piles. 1999. https://hdl.handle.net/10356/13099