Back to search
Nanyang Technological University
Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line
Abstract
dc:description.abstractThis thesis shows the implementation of a simulation-based scheduling system in a semi-conductor backend assembly line. It gives a brief introduction of IC manufacturing processes from wafer fabrication to backend assembly and test. It looks into the limitation of the current production planning and control systems and the rationality for a finite capacity simulation-based scheduling system.
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Liew, Yuk Kong.
- Advisor dc:contributor.supervisor
-
- Anirudha, Sen
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- NANYANG TECHNOLOGICAL UNIVERSITY
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10356/20539