Back to search

Nanyang Technological University

Two-stage stochastic battery energy storage system planning in renewable-based microgrids with hybrid GA–PSO

Abstract

dc:description.abstract

The rapid growth of renewable energy (RE) integration has driven the development of microgrids as a promising framework for accommodating distributed generation within modern power systems. However, the inherent uncertainty of renewable energy and the high investment cost of battery energy storage system (BESS) pose significant challenges to the optimization of their deployment. Therefore, it is essential to formulate a systematic planning framework to determine the optimal siting and sizing of BESS while considering system uncertainties and operational performance. In this work, a two-stage stochastic planning framework is formulated for the optimal deployment of BESS in a renewable-based microgrid (RMG). In the first stage, a hybrid Genetic Algorithm–Particle Swarm Optimization (GA-PSO) approach is developed to solve the BESS siting and sizing problem. In the second stage, a Mixed Integer Linear Programming (MILP) model is formulated to optimize the operational dispatch under multiple uncertainty scenarios. To characterize the stochastic variations in renewable generation and load demand, Latin Hypercube Sampling (LHS) is utilized to generate a large set of scenarios, which are subsequently reduced using Simultaneous Backward Reduction (SBR) to obtain a representative subset with improved computational efficiency. A comprehensive case study based on the IEEE 33-bus test system is conducted to validate the proposed approach. The results reveal that the hybrid GA–PSO algorithm outperforms the conventional PSO in terms of convergence speed and optimization effectiveness. Moreover, the integration of BESS significantly contributes to enhanced economic efficiency of the system by enabling energy shifting and peak shaving. The proposed framework yields a higher expected daily profit (EDP) compared to cases without storage or using conventional optimization methods. In conclusion, the two-stage stochastic planning framework proposed in this study, combined with the hybrid GA-PSO and MILP-based operational model, provides an effective and practical solution for BESS deployment in RMG.

Degree

thesis:*
College dc:contributor.school
School of Electrical and Electronic Engineering
Grantor dc:publisher
Nanyang Technological University
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Zhang, Zihan
Advisor dc:contributor.supervisor
  • Xu Yan

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/215638

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
related terms
citation

Zhang, Zihan. Two-stage stochastic battery energy storage system planning in renewable-based microgrids with hybrid GA–PSO. Nanyang Technological University, 2026. https://hdl.handle.net/10356/215638